Quantity Surveying and Project Management
Call Us Today On 053 9129351 OR 087 236 7048
  • Perimeter railing posts, kerbs and playground fittings installed
  • Wet pour surfacing base layer progressing
  • Wet pour surfacing base layer progressing
  • Wet pour surfacing base layer progressing
  • Wet pour top layer with graphics being installed
  • Wet pour top layer with graphics being installed
Client: Blackwater Hall Committee

Design & Construction of Blackwater Community Playground